Construction of Foot Walk & Raising of Existing Drain Side Wall on Asgiriya Bypass Road (CH 0+800 — 0+950 km) RHS
Pedestrian Safety Upgrade, Roadside Storm-Water Drainage Rehabilitation & Interlocking Paving Engineering in Kandy
Executive Overview
Pragathi Civil Construction was commissioned to execute the comprehensive construction of a modern pedestrian foot walk and structural rehabilitation of the existing roadside storm-water drain along the busy Asgiriya Bypass Road (Chainage 0+800 to 0+950 km RHS) in the historic city of Kandy. With a total verified bill amount of LKR 5,245,269.20, this high-impact urban engineering project resolved severe pedestrian vulnerability and chronic monsoon flooding along a 150-meter bottleneck corridor.
Prior to construction, the right-hand shoulder of the Asgiriya Bypass featured unpaved, eroded gravel shoulders, an uncovered and sunken drainage ditch, and uneven levels that forced pedestrians directly into heavy vehicular traffic. Our engineering team executed precision elevation of the existing drainage side walls, cast structural reinforced concrete cover slabs, placed durable precast roadside kerb stones, laid high-strength interlocking paving blocks on engineered sand bedding, and integrated tactile blister paving tiles for universal accessibility.
Scope of Works Executed
1. Raising of Existing Storm-Water Drain Side Walls
- Surface scarification, debris desilting, and dowel bar anchoring into existing roadside masonry drain walls.
- Fabrication and alignment of precise timber shuttering along the full 150 m longitudinal channel.
- Casting reinforced concrete wall extensions to bring drain tops to true sidewalk finished levels, eliminating storm-water overflow into adjacent premises.
2. Precast Kerb Stone Setting & Bedding
- Excavation of trench along the carriageway edge and laying Grade 15 concrete foundation bedding.
- Installation and laser alignment of precast concrete kerbs with concrete haunch backing to physically segregate pedestrian walkways from road vehicles.
3. Interlocking Paving & Precast RC Drain Slabs
- Spreading, screeding, and heavy mechanical plate compaction of engineered quarry dust / sand bedding.
- Laying high-compressive-strength interlocking concrete paving blocks with sand-swept joints.
- Precision seating of heavy-duty reinforced concrete (RC) drain cover slabs with flush pedestrian surface transitions and cleaning access.
4. Universal Accessibility & Tactile Paver Integration
- Installation of raised blister tactile paving flags to guide visually impaired pedestrians at road junctions and cross-overs.
- Smooth ramp transitions at commercial entrances and private driveways ensuring universal wheelchair accessibility.
Engineering Challenges Overcome
High-Density Urban Traffic Corridor: Managing continuous live vehicle traffic, three-wheelers, buses, and shopfront deliveries on the busy Asgiriya Bypass without causing traffic blockages during shuttering, concrete pouring, and paving operations.
Live Hydraulic Drainage Maintenance: Elevating and repairing aging masonry drain walls while ensuring unobstructed storm-water discharge during sudden torrential Kandy monsoon rains.
Precision Flush Surface Transitions: Integrating precast kerbs, interlocking pavers, and removable RC drain slabs into a completely seamless, trip-hazard-free pedestrian surface that matches existing boundary gates and property thresholds.
Project Impact & Value Delivered
Pedestrian Protection
Physically segregated foot traffic from high-speed vehicular traffic along the busy Asgiriya Bypass corridor.
Flood Elimination
Elevated drain side walls prevent storm-water overflow into adjacent residences and business properties.
Universal Accessibility
Tactile warning blister pavers and flush crosswalk ramps provide safe navigation for visually impaired pedestrians.