Nawalapitiya – Harangala Road Rehabilitation (Package NOR/98)

Cyclone Ditwah Emergency Disaster Recovery & Highland Highway Modernization | Client: Road Development Authority (RDA) | Value: LKR 222.57 Million

Rehabilitation of Nawalapitiya – Harangala Road Network Package NOR/98
Highland Highways & Earthworks Package NOR/98 LKR 222.57M Contract

Rehabilitation & Improvement of Nawalapitiya – Harangala Road Network

Emergency Disaster Recovery & Mountain Highway Modernization Under RDA Contract RDA/DRP/CEN/NUE/NOR/98

Following the catastrophic landslide disruptions caused by Cyclone Ditwah across the mountainous central massif of Sri Lanka, the Road Development Authority (RDA) awarded Pragathi Civil Construction (Pvt) Ltd the high-priority contract for the comprehensive rehabilitation, slope stabilization, and modernization of the critical Nawalapitiya – Harangala Road Network.

Spanning across 25.22 total kilometers of rugged, winding hill-country terrain between Kandy and Nuwara Eliya Districts, these corridors form the primary economic lifeline for tea plantation logistics, highland hydro-power reservoir management, and rural agrarian mobility.

Strategic Road Network Coverage (25.22 km Total)

Corridor 1 • B-148

Harangala – Kalapitiya Road

Ch. 0+000 to Ch. 10+700
Total Length: 10.70 km

Corridor 2 • B-491

Harangala Dam Crest Approach

Ch. 0+000 to Ch. 3+820
Total Length: 3.82 km

Corridor 3 • B-506

Nawalapitiya – Harangala Road

Ch. 0+000 to Ch. 10+700
Total Length: 10.70 km

Scope of Works & Engineering Deliverables

1. Highway Pavement & Deep Slope Earthworks

  • Clearing, benching, and stabilized hillside excavation along unstable geotechnical slip zones.
  • Rapid replacement of unsuitable soft, marshy subgrade soils with high-permeability granular capping layers.
  • Precision subgrade preparation and Dense Aggregate Base Course (ABC) compaction strictly conforming to 98% BS Heavy Density standards.

2. Geotechnical & Slope Protection Structures

  • Heavy-duty cast-in-situ reinforced concrete retaining walls utilizing Grade 25 Structural Concrete for permanent toe stabilization.
  • Multi-tiered gravity gabion retaining wall systems lined with non-woven geotextile filter membranes to dissipate hydrostatic pressure in saturated tea estate terrain.

3. Hydraulic Structures & Drainage Networks

  • Installation of high-capacity precast concrete U-drains (Types MCR, MCT, and RRT) with heavy-duty reinforced cover slabs (100 mm & 125 mm).
  • Comprehensive structural widening, reconstruction, and headwall extension of damaged pipe and box culverts.

4. Controlled Non-Explosive Rock Excavation

Safe rock splitting and roadway benching executed utilizing soundless chemical expansive cracking mortar adjacent to sensitive residential settlements and high-voltage transmission lines.

Operational Highlights & Engineering Excellence

•

Accelerated Hill-Country Mobilization: Fully established site headquarters, materials staging yards, compaction testing facilities, and heavy plant fleets within days of receiving the formal Letter of Acceptance.

•

Rigorous Quality Assurance: All physical, chemical, aggregate, and density tests independently certified via RDA Regional Testing Laboratories adhering to CIDA SCA/5 specifications.

•

24/7 Traffic & Community Safety: Active traffic management sequencing, reflective safety signage, and dust control implemented across narrow urban junctions and winding mountain passes.

Infrastructure Solutions

Need a Similar Heavy Civil Engineering Solution?

Consult Pragathi Civil Construction's senior engineering team for project estimation, structural retaining walls, or highway works.

WhatsApp Direct Request a Quote ← All Projects
WhatsApp Direct