Commercial & Parking
Car Park Construction
This commercial infrastructure project involved the construction of a customer car park facility for Sriyani Dress Point in Kandy, designed to dramatically enhance customer vehicle access, parking capacity, and site circulation. Completed on December 09, 2020.
Project Scope & Construction Highlights
The project scope spanned complete site clearing, leveling, deep subgrade compaction, aggregate base installation, interlocking paving blocks, perimeter kerbing, drainage culverts, and crisp paint line demarcation.
- Sub-base preparation with plate compactors and heavy tandem rollers achieving optimal load-bearing density.
- High-strength Uni-paving blocks laid over washed bedding sand with sand-joint vibration.
- Cast-in-situ reinforced concrete kerbing locking paving perimeters securely in place.
- Integrated surface drainage channels connected to the municipal stormwater network to eliminate puddle formation.
- Clearly demarcated standard parking stalls, disabled bays, and one-way directional driving lanes.
Visual Site Evidence
High-Resolution Field Documentation • CIDA C4 Quality Verified
Authentic Project Photographs
Infrastructure Solutions
Need a Similar Heavy Civil Engineering Solution?
Consult Pragathi Civil Construction's senior engineering team for project estimation, structural retaining walls, or highway works.